The 2015 International Energy Code and the 2016 NYS Supplement
3 paths to meet code, Prescriptive, Performance, HERS ERI
Mandatory provisions, apply to all paths. 3 Air changes with blower door !
- Over all higher R values in the prescriptive path (Which other paths compare to).
- Envelope air sealing and ensuring insulation is in contact on all sides. (Thermal Bypass checklist).
- R402.2.3 Eave baffle. (Wind wash baffles)
Mandatory blower door test, 3 ACH50 on all 3 paths. - Duct tightness of 4cfm per 100 sq ft. Prescriptive.
Must be tested and used in
Performance and ERI path but there is no maximum leakage rate. - 75% high efficiency lighting.
- Mechanical Ventilation
(Energy star labeled bath fan on smart exhaust air cycler timer or ERV). - R-3 pipe insulation on all pipes carrying fluids over 105˚ or under 55˚.
- Manual J, S, D.
- Hot water boiler out door setback control.
- Programmable set back thermostat.
- Hatch gasketed and insulated to surrounding ceiling R values.