Building Science 101 / Code

Lesson 12 of 14

2016 NYS Energy Conservation Construction Code

The 2015 International Energy Code and the 2016 NYS Supplement

3 paths to meet code, Prescriptive, Performance, HERS ERI

Mandatory provisions, apply to all paths. 3 Air changes with blower door !

  • Over all higher R values in the prescriptive path (Which other paths compare to).
  • Envelope air sealing and ensuring insulation is in contact on all sides. (Thermal Bypass checklist).
  • R402.2.3 Eave baffle. (Wind wash baffles)
    Mandatory blower door test, 3 ACH50 on all 3 paths.
  • Duct tightness of 4cfm per 100 sq ft. Prescriptive.
    Must be tested and used in
    Performance and ERI path but there is no maximum leakage rate.
  • 75% high efficiency lighting.
  • Mechanical Ventilation
    (Energy star labeled bath fan on smart exhaust air cycler timer or ERV).
  • R-3 pipe insulation on all pipes carrying fluids over 105˚ or under 55˚.
  • Manual J, S, D.
  • Hot water boiler out door setback control.
  • Programmable set back thermostat.
  • Hatch gasketed and insulated to surrounding ceiling R values.